the laminate on the lower floor has been installed. It is called "Georgia Pecan." We will install the interior doors on the lower floor this week. The guy who is installing the crown molding only works on Saturday, so he did not finish yesterday, but he will complete his work this Saturday. The outside HVAC units have arrived and are being installed this week.

Hopefully, we will be able to form up the garage slab and retainer wall and pour the footings this week. With the hard freeze this past week the ground has not dried up enough to remove the remaining dirt. At the same time we pour the footings for the garage, we hope to pour footings for a couple retaining walls and the front porch.